Commworx were awarded by the Joint Venture of Lend Lease and Bouygues Construction a contract to supply and install inground services at one of the DRS location on the Northconnex project. This included all of the pit and pipe work for the Electrical and communications services along with the Stormwater, water, sewer and Fire services.

This quickly went from 1 location to 3. Due to Commworx’s ability to deliver we were awarded works in other areas of the project that needed assistance. Commworx supplied multiple crews with robotic grinding heads to clear damaged Comms, electrical and stormwater pipe.

As part of the continued ability to deliver Commworx were award a large amount of cable hauling works of LV and communications cable.

Providing over 40 staff working 24 x 7 which covered the Xmas period to assist with project time frames. Commworx have also supplied electricians to assist with the terminations and commissioning of equipment on site.

Type of Equipment used on site
• Excavators up to 30t
• Robotic Grinding tools
• Vac Trucks, EWP’s
• Cable winches, confined space equipment
• Various Trucks, Utes and Equipment