Commworx provided project Management, Project Engineer and Supervision along with labour and plant to complete the following scopes​:​

- Construction of site access, laydowns and Site Compound.​

- 1,000m3 of topsoil strip to stockpile.​

- Demo and disposal of existing stormwater pipes, drains and footings.​

- 21,000m3 of cut to fill under level 1 supervision​

- 22,000m3 if general fill import. Includes place and compact under level 1 supervision​

- Import and place 13,000m3 of road base for substation and BESS Yard​

- Import 2,100m3 of roadbase for internal and external roads​

- 1,800m2 of 2 coat spray seal​

- 400m of kerb​

- 2,100m of stormwater drainage ranging from 150mm PVC through to twin 750mm Diameter Stormpro.​

- Install of 61 stormwater pits and 8 headwalls​

- 4,500m3 of 20mm aggregate for the Substation and BESS capping layer.​

- Implementation and management of onsite sed basins and erosion and sed control. Included treatment and testing of basin prior to removal of water from site.​